Pigwich
Well-known member
So I think the Bolt isn't such a quick charger over CCS as we might have all hoped...
I plugged in my 55% charged Bolt today to a 50 KW fast charger, and it took it a full 32 minutes to bring the car up to 80%, which according to the machine, added 16 kwh to the pack. Now... I know that temperature and all that jazz are factors, but I get the feeling that it should have happened a little faster than this? I know when I'd plug my Spark in to the same charger, it would gulp down pretty close to the 50kw until it started to taper off when it got up to 80%. Today, like I said, I only took the Bolt up to 80% full, so it shouldn't have started to taper much. It just seems to be a little slower at the fast charger. Also, I was just coming off a long drive down a tall hill (a 20 mile, 5000 foot tall hill) but it was pretty cool up there, maybe in the low 50's. Hmmm...
I also sort of noticed that it was slow when I took delivery of it from the dealership. It had of course never been plugged in before, and they put it on their 50KW machine and it took 40+ minutes to put a hundred or whatever miles on it, and it was for sure not hot and definitely not even remotely close to fully charged. Not having any idea what the pack temperature was of course complicates this, but what are people experiencing with charging times on the DC fast chargers?
I plugged in my 55% charged Bolt today to a 50 KW fast charger, and it took it a full 32 minutes to bring the car up to 80%, which according to the machine, added 16 kwh to the pack. Now... I know that temperature and all that jazz are factors, but I get the feeling that it should have happened a little faster than this? I know when I'd plug my Spark in to the same charger, it would gulp down pretty close to the 50kw until it started to taper off when it got up to 80%. Today, like I said, I only took the Bolt up to 80% full, so it shouldn't have started to taper much. It just seems to be a little slower at the fast charger. Also, I was just coming off a long drive down a tall hill (a 20 mile, 5000 foot tall hill) but it was pretty cool up there, maybe in the low 50's. Hmmm...
I also sort of noticed that it was slow when I took delivery of it from the dealership. It had of course never been plugged in before, and they put it on their 50KW machine and it took 40+ minutes to put a hundred or whatever miles on it, and it was for sure not hot and definitely not even remotely close to fully charged. Not having any idea what the pack temperature was of course complicates this, but what are people experiencing with charging times on the DC fast chargers?