Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Normal
A good contractor can run power like that in a couple of days and running power really doesn't cost that much as long as the power is available at the main distribution panel. But I'm sure many dealers are going to put off the installations until they really need them. For most dealers that won't be until the end of the year when GM does a nation wide rollout of the Bolt EV.